| Customer |
Installation |
Industry |
Country |
Deliveries and services |
Month |
| PF Albbruck |
Albbruck |
Paper |
D |
Chamber pressure nozzles |
January |
| Ciba |
Kaisten |
Chemical |
CH |
Delivery 2 pcs. superheater |
January |
| E.ON |
Zolling |
Energy |
D |
Revision electric boiler |
February |
| EnBW |
Altbach |
Energy |
D |
Parts electric boiler |
February |
| Nestlé |
Konolfingen |
Food |
CH |
Stack and Heat Recovery |
March |
| Nestlé |
Orbe |
Food |
CH |
Tubes wall with NH3 injection |
March |
| Dalkia/AREVA |
La Hague |
Energy |
F |
Inspection and expertise |
March |
| Siegfried |
Zofingen |
Chemical |
CH |
Repair Boiler |
April |
| Dalkia/AREVA |
La Hague |
Energy |
F |
Parts electric boiler |
April |
| SF-Chem |
SF-Chem |
Chemie |
CH |
Renovation three-pass boiler |
April |
| SACOFRINA |
Unibra |
Food |
CH |
Parts electric boiler |
April |
| Dalkia/AREVA |
La Hague |
Energy |
F |
Revision electric boiler |
May |
| DLM |
Belimed-Sauter |
Misc. |
CH |
Calculation boiler 500 kW |
June |
| KKL |
Leibstadt |
Energy |
CH |
Parts electric boiler |
June |
| Ciba |
Kaisten |
Chemical |
CH |
De- und Montage Superheater |
June |
| ABBOTT |
Liestal |
Chemical |
CH |
Renovation three-pass boiler 2 |
July |
| SIL |
Lausanne |
Heating |
CH |
Silencer boiler 1 |
July |
| Ciba |
Kaisten |
Chemical |
CH |
Replacement tube |
July |
| EBAG |
Biberist |
Energy |
CH |
Boiler 4 explosion flap |
July |
| SIL |
Lausanne |
Heating |
CH |
Boiler 4 exhaust valve |
July |
| ERZ |
HKW Aubrugg |
Heating |
CH |
Reparation Superheater |
July |
| E.ON |
Zolling |
Energy |
D |
Parts electric boiler |
July |
| HEXAGON |
MARSAVCO |
Misc. |
D |
Transformer 2000 kVA |
July |
| ZAB |
Bazenheid |
WTE |
CH |
Measurem. fluidized bed boilers |
July |
| SIG |
Cheneviers |
WTE |
CH |
Sonoforce Linie 3,5 and 6 |
August |
| Parat Halvorsen |
Hoeyland Meieri |
Food |
N |
Parts electric boiler |
August |
| ALSTOM Egypt |
Kafr El-Dawar |
Misc. |
EG |
Expertise Gas Conversion |
August |
| PF Albbruck |
Albbruck |
Paper |
D |
Inspection Boiler 6 |
August |
| DLM |
Belimed-Sauter |
Misc. |
CH |
Calculation Boiler 600 kW |
August |
| Roche |
Basel |
Chemical |
CH |
Optimization Study K6 and K7 |
August |
| PF Cham |
Cham |
Paper |
CH |
Revision Boiler 2 |
August |
| ERZ |
HKW Aubrugg |
Heating |
CH |
Measurem. boilers K1 and K2 |
August |
| DLM |
Ökozentrum |
Misc. |
CH |
Study Exhaust steam engine |
September |
| PF Utzenstorf |
Utzenstorf |
Paper |
CH |
Revision electric boiler |
October |
| GZM |
Lyss |
Misc. |
CH |
Reparatur boiler 1 |
October |
| PF Utzenstorf |
Utzenstorf |
Paper |
CH |
Decommissioning study |
October |
| SGV |
DS Stadt Luzern |
Misc. |
CH |
New Pipe Distribution |
December |
| DES |
Dottikon |
Chemical |
CH |
Revision of special boiler |
December |
| KKL |
Leibstadt |
Energy |
CH |
SPX Pump Spares |
December |
| DLM |
CPT |
Misc. |
CH |
Calculation smal boiler |
December |